IAC Assessment: NC0531
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0531
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2014
Principal Product Automotive bearing
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3562 - Ball And Roller Bearings
Sales $50,000,000-$100,000,000
# of Employees 600
Plant Area (Sq.Ft.) 216,000
Annual Production 150,000,000 Pieces
Production Hrs. Annual 7,250
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,082,604 33,998,400 kWh $0.03
Electricity Demand $1,292,758 62,573 kW-months/year $20.66
Electricity Fees $3,480 - $ -
Natural Gas $196,736 32,275 MMBtu $6.10
TOTAL ENERGY COSTS $2,801,969
RECOMMENDED SAVINGS* $105,257 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $101,427
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,220
Cost:
$200
$9,288 281,451 $11,132 563 $(-1,600) - - - $(-1,600) - $9,288
281,451
kWh
$11,132
563
kW-months/year
$(-1,600)
-
$
-
-
$
$(-1,600)
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$80,544
Cost:
$28,000
$36,632 1,110,048 $43,912 2,220 - - - - - - $36,632
1,110,048
kWh
$43,912
2,220
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$836
Cost:
$240
$212 6,412 $175 9 - - - - $449 - $212
6,412
kWh
$175
9
kW-months/year
-
-
$
-
-
$
$449
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$874
Cost:
$1,255
$253 7,675 $598 30 - - $23 - - - $253
7,675
kWh
$598
30
kW-months/year
-
-
$
$23
-
$
-
-
$
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$625
Cost:
$100
- - $625 62 - - - - - - -
-
kWh
$625
62
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,956
Cost:
$1,935
$1,339 40,571 $1,617 82 - - - - - - $1,339
40,571
kWh
$1,617
82
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,202
Cost:
$4,256
$1,006 30,221 $1,196 60 - - - - - - $1,006
30,221
kWh
$1,196
60
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$105,257
Cost:
$35,986
$48,730 1,476,378 $59,255 3,026 $(-1,600) - $23 - $(-1,151) - $48,730
1,476,378
kWh
$59,255
3,026
kW-months/year
$(-1,600)
-
$
$23
-
$
$(-1,151)
-
$
TOTAL IMPLEMENTED Savings:
$101,427
Cost:
$32,796
$47,138 1,428,132 $57,040 2,914 $(-1,600) - - - $(-1,151) - $47,138
1,428,132
kWh
$57,040
2,914
kW-months/year
$(-1,600)
-
$
-
-
$
$(-1,151)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost