Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsNAICS | 33631 | Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0682 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,025 | $1,000 | Implemented |
UD0682 # 11 Y:2003 | 11 | 2003 | INSTALL OCCUPANCY SENSORS | $366 | $428 | Not Implemented |
UD0682 # 10 Y:2003 | 10 | 2003 | DISCONNECT BALLASTS | $1,534 | $116 | Not Implemented |
UD0682 # 02 Y:2003 | 02 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,255 | $5,000 | Not Implemented |
UD0682 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,809 | $47,488 | Not Implemented |
UD0682 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,062 | $5,376 | Not Implemented |
UD0682 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $27,674 | $15,870 | Not Implemented |
UD0682 # 07 Y:2003 | 07 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,800 | $2,000 | Implemented |
UD0682 # 09 Y:2003 | 09 | 2003 | $2,596 | $0 | Implemented | |
UD0682 # 03 Y:2003 | 03 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,300 | $11,000 | Not Implemented |
UD0682 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,790 | $3,000 | Implemented |
UD0680 # 14 Y:2003 | 14 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,717 | $0 | Not Implemented |
UD0680 # 13 Y:2003 | 13 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,815 | $0 | Implemented |
UD0680 # 12 Y:2003 | 12 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,465 | $900 | Implemented |
UD0680 # 11 Y:2003 | 11 | 2003 | COVER OPEN TANKS | $2,708 | $1,375 | Implemented |
UD0680 # 15 Y:2003 | 15 | 2003 | DISCONNECT BALLASTS | $1,248 | $0 | Not Implemented |
UD0680 # 10 Y:2003 | 10 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,078 | $0 | Implemented |
UD0680 # 09 Y:2003 | 09 | 2003 | OPTIMIZE PLANT POWER FACTOR | $4,028 | $5,000 | Not Implemented |
UD0680 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,115 | $0 | Not Implemented |
UD0680 # 07 Y:2003 | 07 | 2003 | ADD AREA LIGHTING SWITCHES | $6,667 | $0 | Not Implemented |
UD0680 # 06 Y:2003 | 06 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $6,819 | $0 | Not Implemented |
UD0680 # 04 Y:2003 | 04 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,140 | $0 | Implemented |
UD0680 # 03 Y:2003 | 03 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $9,824 | $2,160 | Not Implemented |
UD0680 # 02 Y:2003 | 02 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,750 | $1,460 | Implemented |
UD0680 # 01 Y:2003 | 01 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $24,031 | $500 | Implemented |