Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 336310 | Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0156 # 05 Y:2022 | 05 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,101 | $4,200 | Implemented |
IP0156 # 01 Y:2022 | 01 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,354 | $0 | Implemented |
IP0156 # 02 Y:2022 | 02 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $140 | $11 | Implemented |
IP0156 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,188 | $5,007 | Not Implemented |
IP0156 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $295 | $154 | Implemented |
IP0084 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,534 | $928 | Not Implemented |
IP0084 # 15 Y:2017 | 15 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,680 | $25,865 | Implemented |
IP0084 # 14 Y:2017 | 14 | 2017 | OPTIMIZE PLANT POWER FACTOR | $13,460 | $43,320 | Not Implemented |
IP0084 # 13 Y:2017 | 13 | 2017 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $446 | $1,250 | Implemented |
IP0084 # 12 Y:2017 | 12 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $519 | $727 | Not Implemented |
IP0084 # 11 Y:2017 | 11 | 2017 | INSTALL OCCUPANCY SENSORS | $3,393 | $2,038 | Implemented |
IP0084 # 10 Y:2017 | 10 | 2017 | APPLY FOR INVESTMENT INCENTIVES | $238 | $125 | Not Implemented |
IP0084 # 09 Y:2017 | 09 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $910 | $416 | Not Implemented |
IP0084 # 07 Y:2017 | 07 | 2017 | INSULATE BARE EQUIPMENT | $974 | $203 | Implemented |
IP0084 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,221 | $290 | Implemented |
IP0084 # 05 Y:2017 | 05 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,415 | $130 | Implemented |
IP0084 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,458 | $65 | Implemented |
IP0084 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $383 | $4 | Not Implemented |
IP0084 # 02 Y:2017 | 02 | 2017 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $131 | $0 | Implemented |
IP0084 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,043 | $0 | Not Implemented |
IP0005 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,540 | $0 | Implemented |
IP0005 # 05 Y:2012 | 05 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,542 | $37,000 | Not Implemented |
IP0005 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $997 | $1,803 | Not Implemented |
IP0005 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $683 | $0 | Implemented |
IP0005 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $33,112 | $0 | Not Implemented |