Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsNAICS | 33633 | Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2309 # 07 Y:2023 | 07 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,813 | $15,000 | Not Implemented |
UL2309 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,607 | $1,000 | Not Implemented |
UL2309 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $194,066 | $1,198,885 | Not Implemented |
UL2309 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,370 | $18,360 | Implemented |
UL2309 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $957 | $1,596 | Implemented |
UL2309 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,305 | $2,688 | Implemented |
UL2309 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,637 | $0 | Implemented |
UL2305 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,238 | $9,672 | Not Implemented |
UL2305 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,322 | $500 | Implemented |
UL2305 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,542 | $325,397 | Not Implemented |
UL2305 # 04 Y:2023 | 04 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,439 | $0 | Not Implemented |
UL2305 # 08 Y:2023 | 08 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,779 | $0 | Implemented |
UL2305 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,738 | $0 | Implemented |
UL2305 # 07 Y:2023 | 07 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $29,120 | $60,633 | Not Implemented |
UL2305 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,763 | $9,750 | Not Implemented |
UL2208 # 04 Y:2022 | 04 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $29,853 | $0 | Not Implemented |
UL2208 # 05 Y:2022 | 05 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $58,141 | $745,985 | Not Implemented |
UL2208 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,079 | $9,418 | Not Implemented |
UL2208 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $35,045 | $0 | Not Implemented |
UL2208 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $1,464 | $422 | Not Implemented |
UK1908 # 12 Y:2019 | 12 | 2019 | CLEAN CONDENSER TUBES | $15,832 | $7,858 | Implemented |
UK1908 # 13 Y:2019 | 13 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,547 | $8,300 | Implemented |
UK1908 # 11 Y:2019 | 11 | 2019 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $13,831 | $5,000 | Not Implemented |
UK1908 # 10 Y:2019 | 10 | 2019 | REDUCE FLUID FLOW RATES | $2,913 | $1,900 | Not Implemented |
UK1908 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,190 | $3,038 | Implemented |