IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
NAICS 336330 Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2309 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,370 $18,360 Implemented
UL2309 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,637 $0 Implemented
UL2309 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $957 $1,596 Implemented
UL2309 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,305 $2,688 Implemented
UL2305 # 08 Y:2023 08 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,779 $0 Implemented
UL2305 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,738 $0 Implemented
UL2305 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,322 $500 Implemented
UK1908 # 15 Y:2019 15 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $63,247 $2,368 Implemented
UK1908 # 17 Y:2019 17 2019 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $1,430 $0 Implemented
UK1908 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,319 $0 Implemented
UK1908 # 13 Y:2019 13 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,547 $8,300 Implemented
UK1908 # 12 Y:2019 12 2019 CLEAN CONDENSER TUBES $15,832 $7,858 Implemented
UK1908 # 09 Y:2019 09 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,838 $1,900 Implemented
UK1908 # 07 Y:2019 07 2019 DISCONNECT BALLASTS $383 $72 Implemented
UK1908 # 06 Y:2019 06 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,551 $0 Implemented
UK1908 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,676 $22,903 Implemented
UK1908 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $116,074 $438,000 Implemented
UK1908 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,190 $3,038 Implemented