Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
266
matching recommendationsNAICS | 336330 | Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0014 # 04 Y:2007 | 04 | 2007 | INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES | $44,581 | $51,000 | Implemented |
TT0014 # 05 Y:2007 | 05 | 2007 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $159,283 | $2,912 | Implemented |
UM0327 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,123 | $9,375 | Implemented |
UM0327 # 02 Y:2007 | 02 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $18,136 | $9,406 | Not Implemented |
UM0327 # 03 Y:2007 | 03 | 2007 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $9,041 | $6,735 | Not Implemented |
UM0327 # 04 Y:2007 | 04 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,637 | $2,140 | Not Implemented |
UM0327 # 05 Y:2007 | 05 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,516 | $1,000 | Implemented |
UM0327 # 06 Y:2007 | 06 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,955 | $787 | Not Implemented |
UM0327 # 07 Y:2007 | 07 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $981 | $1,000 | Not Implemented |
UM0327 # 08 Y:2007 | 08 | 2007 | COVER OPEN TANKS | $561 | $275 | Implemented |
UM0327 # 09 Y:2007 | 09 | 2007 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $416 | $780 | Not Implemented |
UM0320 # 01 Y:2007 | 01 | 2007 | REDUCE VENTILATION AIR | $20,841 | $4,960 | Not Implemented |
UM0320 # 02 Y:2007 | 02 | 2007 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $19,072 | $0 | Implemented |
UM0320 # 03 Y:2007 | 03 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,725 | $3,000 | Not Implemented |
UM0320 # 04 Y:2007 | 04 | 2007 | REVISE SMOKE CLEANUP FROM OPERATIONS | $11,829 | $1,846 | Implemented |
UM0320 # 05 Y:2007 | 05 | 2007 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $10,797 | $0 | Implemented |
UM0320 # 06 Y:2007 | 06 | 2007 | OPTIMIZE PLANT POWER FACTOR | $10,572 | $19,721 | Implemented |
UM0320 # 07 Y:2007 | 07 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,938 | $500 | Implemented |
UM0320 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,982 | $825 | Implemented |
UM0320 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,603 | $20 | Implemented |
UM0320 # 10 Y:2007 | 10 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $4,703 | $1 | Implemented |
UM0320 # 11 Y:2007 | 11 | 2007 | DISCONNECT BALLASTS | $3,782 | $0 | Implemented |
UM0320 # 12 Y:2007 | 12 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,510 | $80 | Implemented |
UM0320 # 13 Y:2007 | 13 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $900 | $100 | Implemented |
UM0273 # 01 Y:2005 | 01 | 2005 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $16,200 | $400 | Not Implemented |