IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

246

matching recommendations
Reset
NAICS 336330 Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1908 # 18 Y:2019 18 2019 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $21,879 $28,230 Not Implemented
UK1908 # 17 Y:2019 17 2019 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $1,430 $0 Implemented
UD0997 # 01 Y:2019 01 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $5,924 $0 Implemented
UD0997 # 02 Y:2019 02 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,364 $0 Implemented
UD0997 # 03 Y:2019 03 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,727 $7,000 Not Implemented
UD0997 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $60,472 $17,300 Not Implemented
UD0997 # 05 Y:2019 05 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $17,400 $27,000 Not Implemented
UD0997 # 06 Y:2019 06 2019 RECOVER WASTE HEAT FROM EQUIPMENT $10,359 $2,540 Not Implemented
UD0997 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,640 $4,000 Not Implemented
UD0997 # 08 Y:2019 08 2019 INSTALL AUTOMATIC STACK DAMPER $19,943 $1,000 Not Implemented
UD0997 # 09 Y:2019 09 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,037 $50,514 Not Implemented
UD0997 # 10 Y:2019 10 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,439 $164,220 Implemented
NC0626 # 07 Y:2019 07 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,977 $200 Implemented
NC0626 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,564 $40,273 Implemented
NC0626 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $532 $871 Not Implemented
NC0626 # 03 Y:2019 03 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $240 $45 Not Implemented
NC0626 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,034 $135 Implemented
NC0626 # 05 Y:2019 05 2019 RECOVER WASTE HEAT FROM EQUIPMENT $2,962 $4,000 Not Implemented
NC0626 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,170 $9,000 Not Implemented
TT0209 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,744 $5,280 Implemented
TT0209 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,604 $3,500 Not Implemented
TT0209 # 07 Y:2018 07 2018 LEASE EQUIPMENT INSTEAD OF PURCHASING $3,120 $0 Not Implemented
TT0209 # 05 Y:2018 05 2018 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,157 $0 Not Implemented
TT0209 # 09 Y:2018 09 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,382 $1,000 Not Implemented
TT0209 # 10 Y:2018 10 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $755 $2,000 Not Implemented