IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 33634 Motor Vehicle Brake System Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1514 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,139 $896 Implemented
UK1514 # 10 Y:2015 10 2015 ADD AREA LIGHTING SWITCHES $1,177 $940 Not Implemented
UK1514 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $1,704 $2,189 Implemented
UK1514 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,674 $5,574 Not Implemented
UK1514 # 07 Y:2015 07 2015 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $925 $343 Implemented
UK1514 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,377 $0 Not Implemented
UK1514 # 05 Y:2015 05 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $21,417 $0 Implemented
UK1514 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,710 $424 Not Implemented
UK1514 # 13 Y:2015 13 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $10,092 $6,632 Not Implemented
UK1514 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,483 $2,000 Implemented
UK1514 # 02 Y:2015 02 2015 UPGRADE CONTROLS ON COMPRESSORS $11,572 $0 Not Implemented
UK1514 # 01 Y:2015 01 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,570 $8,081 Implemented
UK1514 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,011 $742 Not Implemented
UD0933 # 14 Y:2015 14 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,427 $4,500 Implemented
UD0933 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,290 $0 Not Implemented
UD0933 # 13 Y:2015 13 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,454 $1,000 Implemented
UD0933 # 12 Y:2015 12 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $168,234 $1,058,200 Not Implemented
UD0933 # 11 Y:2015 11 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,138 $9,000 Not Implemented
UD0933 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,874 $48,825 Not Implemented
UD0933 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,264 $10,000 Not Implemented
UD0933 # 07 Y:2015 07 2015 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $15,649 $200 Not Implemented
UD0933 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,155 $2,950 Not Implemented
UD0933 # 05 Y:2015 05 2015 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,075 $0 Implemented
UD0933 # 04 Y:2015 04 2015 COVER OPEN TANKS $1,716 $200 Not Implemented
UD0933 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,840 $0 Implemented