IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
NAICS 336340 Motor Vehicle Brake System Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2216 # 11 Y:2022 11 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,497 $40,000 Not Implemented
UL2216 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,227 $10,882 Implemented
UL2216 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,196 $2,730 Implemented
UL2216 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,028 $0 Implemented
UL2216 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,213 $960 Implemented
UL2216 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $67,103 $45,461 Implemented
UL2216 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,380 $170,625 Not Implemented
UL2216 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,446 $39,000 Not Implemented
UL2216 # 08 Y:2022 08 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $108,561 $1,213,600 Not Implemented
UL2216 # 09 Y:2022 09 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $77,523 $1,418,559 Not Implemented
UL2216 # 10 Y:2022 10 2022 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,758 $500 Not Implemented
UK1605 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,058 $63,000 Not Implemented
UK1605 # 16 Y:2016 16 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,000 $12,000 Not Implemented
UK1605 # 15 Y:2016 15 2016 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $14,200 $5,000 Not Implemented
UK1605 # 14 Y:2016 14 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $58,000 $120,000 Not Implemented
UK1605 # 13 Y:2016 13 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $26,348 $8,200 Not Implemented
UK1605 # 12 Y:2016 12 2016 CLEAN CONDENSER TUBES $5,812 $63 Not Implemented
UK1605 # 11 Y:2016 11 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,502 $775 Implemented
UK1605 # 10 Y:2016 10 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $241 $0 Not Implemented
UK1605 # 09 Y:2016 09 2016 ELIMINATE/REDUCE AN OPERATION $6,733 $1,050 Not Implemented
UK1605 # 07 Y:2016 07 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $21,916 $15,000 Not Implemented
UK1605 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $91,413 $3,000 Implemented
UK1605 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $98,199 $221,000 Implemented
UK1605 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,353 $4,627 Implemented
UK1605 # 03 Y:2016 03 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,844 $1,774 Implemented