Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
361
matching recommendationsNAICS | 33635 | Motor Vehicle Transmission and Power Train Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0487 # 03 Y:2014 | 03 | 2014 | OPTIMIZE PLANT POWER FACTOR | $12,000 | $56,000 | Not Implemented |
WV0487 # 04 Y:2014 | 04 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $10,990 | $7,560 | Implemented |
WV0487 # 05 Y:2014 | 05 | 2014 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $9,081 | $1,000 | Implemented |
WV0487 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $5,633 | $2,520 | Implemented |
WV0487 # 07 Y:2014 | 07 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,533 | $0 | Implemented |
WV0487 # 08 Y:2014 | 08 | 2014 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,271 | $210 | Not Implemented |
WV0487 # 09 Y:2014 | 09 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,002 | $3,401 | Implemented |
WV0487 # 10 Y:2014 | 10 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,857 | $570 | Implemented |
WV0487 # 11 Y:2014 | 11 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $1,698 | $1,760 | Implemented |
WV0487 # 12 Y:2014 | 12 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $1,457 | $1,334 | Implemented |
WV0487 # 13 Y:2014 | 13 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,419 | $70 | Implemented |
WV0487 # 14 Y:2014 | 14 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,359 | $487 | Not Implemented |
WV0487 # 15 Y:2014 | 15 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $931 | $2,000 | Not Implemented |
WV0487 # 16 Y:2014 | 16 | 2014 | INSULATE BARE EQUIPMENT | $564 | $2,006 | Implemented |
WV0487 # 17 Y:2014 | 17 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $534 | $792 | Implemented |
OK0861 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,427 | $1,250 | Implemented |
OK0861 # 02 Y:2013 | 02 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,478 | $1,026 | Not Implemented |
OK0861 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,425 | $1,378 | Not Implemented |
OK0861 # 04 Y:2013 | 04 | 2013 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $834 | $3,110 | Not Implemented |
OK0861 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,689 | $13,383 | Not Implemented |
OK0861 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $377 | $9,558 | Not Implemented |
OK0861 # 07 Y:2013 | 07 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $22,838 | $54,080 | Not Implemented |
OK0861 # 08 Y:2013 | 08 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $960 | $1,500 | Not Implemented |
OK0861 # 09 Y:2013 | 09 | 2013 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $12,086 | $2,710 | Not Implemented |
OK0861 # 10 Y:2013 | 10 | 2013 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $53,906 | $518,400 | Not Implemented |