Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 33635 | Motor Vehicle Transmission and Power Train Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0292 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,057 | $2,190 | Implemented |
TT0292 # 04 Y:2023 | 04 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,900 | $600 | Not Implemented |
TT0292 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,223 | $4,750 | Implemented |
TT0292 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,268 | $50 | Implemented |
TT0292 # 03 Y:2023 | 03 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $8,884 | $18,000 | Implemented |
TT0292 # 01 Y:2023 | 01 | 2023 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $28,974 | $250 | Not Implemented |
TT0292 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,314 | $15,941 | Implemented |
TT0292 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,004 | $4,240 | Not Implemented |
TT0284 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,764 | $13,000 | Implemented |
TT0284 # 06 Y:2023 | 06 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $3,153 | $6,000 | Not Implemented |
TT0284 # 02 Y:2023 | 02 | 2023 | MINIMIZE WATER USAGE | $10,675 | $240 | Implemented |
TT0284 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,705 | $50,300 | Not Implemented |
TT0284 # 10 Y:2023 | 10 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,028 | $60 | Not Implemented |
TT0284 # 09 Y:2023 | 09 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,087 | $1,600 | Not Implemented |
TT0284 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,557 | $3,205 | Not Implemented |
TT0284 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $7,905 | $7,500 | Not Implemented |
TT0284 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,804 | $10,150 | Implemented |
TT0284 # 08 Y:2023 | 08 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,266 | $3,750 | Not Implemented |
TT0259 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $300,781 | $111,421 | Implemented |
TT0259 # 02 Y:2021 | 02 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $62,325 | $1,640 | Implemented |
TT0259 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,112 | $13,000 | Not Implemented |
TT0259 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,779 | $2,738 | Implemented |
TT0259 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,579 | $16,000 | Not Implemented |
TT0259 # 06 Y:2021 | 06 | 2021 | INSULATE BARE EQUIPMENT | $5,951 | $1,314 | Not Implemented |
TT0259 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,907 | $5,500 | Not Implemented |