IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 336350 Motor Vehicle Transmission and Power Train Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1916 # 10 Y:2019 10 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $139,706 $225,000 n/a
UK1916 # 09 Y:2019 09 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $86,132 $206,000 n/a
UK1916 # 08 Y:2019 08 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,946 $0 n/a
UK1916 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,602 $2,270 n/a
UK1916 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,402 $2,614 n/a
UK1916 # 05 Y:2019 05 2019 AIR CONDITION ONLY SPACE NECESSARY $4,922 $11,550 n/a
UK1916 # 04 Y:2019 04 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $195 $75 n/a
UK1916 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,394 $25,674 n/a
UK1916 # 02 Y:2019 02 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $18,894 $0 n/a
UK1916 # 01 Y:2019 01 2019 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $1,170 $0 n/a
UD0769 # 14 Y:2007 14 2007 REDUCE VENTILATION AIR $2,208 $590 Implemented
UD0769 # 17 Y:2007 17 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $1,242 $0 Implemented
UD0769 # 16 Y:2007 16 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,447 $520 Implemented
UD0769 # 15 Y:2007 15 2007 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,800 $500 Implemented
UD0769 # 01 Y:2007 01 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $126,798 $0 Implemented
UD0769 # 13 Y:2007 13 2007 UPGRADE CONTROLS ON COMPRESSORS $3,980 $0 Implemented
UD0769 # 12 Y:2007 12 2007 REDUCE VENTILATION AIR $17,703 $26,910 Not Implemented
UD0769 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,569 $3,275 Implemented
UD0769 # 10 Y:2007 10 2007 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $10,000 $25,000 Not Implemented
UD0769 # 09 Y:2007 09 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $13,400 $600 Not Implemented
UD0769 # 08 Y:2007 08 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $23,200 $400 Implemented
UD0769 # 07 Y:2007 07 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $25,268 $0 Implemented
UD0769 # 06 Y:2007 06 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $39,200 $130,000 Implemented
UD0769 # 05 Y:2007 05 2007 USE RADIANT HEATER FOR SPOT HEATING $44,667 $28,125 Implemented
UD0769 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,170 $110,000 Implemented