Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 336350 | Motor Vehicle Transmission and Power Train Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0292 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,268 | $50 | Implemented |
TT0292 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,223 | $4,750 | Implemented |
TT0292 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,057 | $2,190 | Implemented |
TT0292 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,004 | $4,240 | Not Implemented |
TT0292 # 04 Y:2023 | 04 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,900 | $600 | Not Implemented |
TT0292 # 03 Y:2023 | 03 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $8,884 | $18,000 | Implemented |
TT0292 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,314 | $15,941 | Implemented |
TT0292 # 01 Y:2023 | 01 | 2023 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $28,974 | $250 | Not Implemented |
TT0284 # 09 Y:2023 | 09 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,087 | $1,600 | Not Implemented |
TT0284 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,705 | $50,300 | Not Implemented |
TT0284 # 02 Y:2023 | 02 | 2023 | MINIMIZE WATER USAGE | $10,675 | $240 | Implemented |
TT0284 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,764 | $13,000 | Implemented |
TT0284 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,557 | $3,205 | Not Implemented |
TT0284 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $7,905 | $7,500 | Not Implemented |
TT0284 # 06 Y:2023 | 06 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $3,153 | $6,000 | Not Implemented |
TT0284 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,804 | $10,150 | Implemented |
TT0284 # 08 Y:2023 | 08 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,266 | $3,750 | Not Implemented |
TT0284 # 10 Y:2023 | 10 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,028 | $60 | Not Implemented |
TT0259 # 06 Y:2021 | 06 | 2021 | INSULATE BARE EQUIPMENT | $5,951 | $1,314 | Not Implemented |
TT0259 # 08 Y:2021 | 08 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $1,752 | $400 | Not Implemented |
TT0259 # 07 Y:2021 | 07 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,907 | $5,500 | Not Implemented |
TT0259 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,579 | $16,000 | Not Implemented |
TT0259 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,779 | $2,738 | Implemented |
TT0259 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,112 | $13,000 | Not Implemented |
TT0259 # 02 Y:2021 | 02 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $62,325 | $1,640 | Implemented |