IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

252

matching recommendations
Reset
NAICS 33636 Motor Vehicle Seating and Interior Trim Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0342 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,313 $7,500 Implemented
UM0342 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,736 $13,776 Not Implemented
UM0342 # 04 Y:2008 04 2008 REDUCE VENTILATION AIR $2,824 $1,228 Not Implemented
UM0342 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,462 $515 Not Implemented
UM0342 # 06 Y:2008 06 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,437 $0 Not Implemented
UM0342 # 07 Y:2008 07 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $798 $638 Implemented
LL0286 # 01 Y:2007 01 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,249 $750 Not Implemented
LL0286 # 02 Y:2007 02 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,092 $696 Implemented
LL0286 # 03 Y:2007 03 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,261 $304 Not Implemented
LL0286 # 04 Y:2007 04 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,927 $90 Implemented
LL0286 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,588 $920 Implemented
LL0286 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,534 $30 Implemented
LL0286 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $602 $420 Not Implemented
LL0286 # 08 Y:2007 08 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $519 $798 Implemented
MI0069 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $46,943 $600 Not Implemented
MI0069 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $37,385 $2,100 Implemented
MI0069 # 03 Y:2003 03 2003 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $7,200 $3,222 Not Implemented
MI0069 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,203 $3,536 Implemented
MI0069 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $11,691 $0 Implemented
MI0069 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $147 $1,608 Not Implemented
MI0069 # 07 Y:2003 07 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $68,389 $68,389 Not Implemented
SF0261 # 01 Y:2003 01 2003 REPAIR AND ELIMINATE STEAM LEAKS $10,012 $0 Implemented
SF0261 # 02 Y:2003 02 2003 UPGRADE CONTROLS ON COMPRESSORS $3,924 $52 Not Implemented
SF0261 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $4,341 $485 Not Implemented
SF0261 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,010 $33,679 Not Implemented