IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 336360 Motor Vehicle Seating and Interior Trim Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0014 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,203 $4,540 Not Implemented
MU0014 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,023 $0 Implemented
MU0014 # 04 Y:2022 04 2022 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $6,530 $0 Not Implemented
MU0014 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,680 $4,307 Implemented
MU0014 # 06 Y:2022 06 2022 USE OPTIMUM TEMPERATURE $1,469 $155 Not Implemented
MU0014 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $414 $349 Not Implemented
MU0014 # 08 Y:2022 08 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $109 $0 Implemented
MU0014 # 09 Y:2022 09 2022 RECOVER WASTE HEAT FROM EQUIPMENT $91 $261 Not Implemented
MU0014 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,107 $30,064 Not Implemented
UM0466 # 05 Y:2016 05 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $387 $400 Implemented
UM0466 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,085 $21,450 Not Implemented
UM0466 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,784 $1,000 Implemented
UM0466 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $1,801 $1,000 Implemented
UM0466 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,747 $2,000 Not Implemented
UM0425 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $695 $308 Implemented
UM0425 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,752 $5,000 Implemented
UM0425 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,115 $0 Implemented
UM0425 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,480 $3,300 Implemented
UM0425 # 01 Y:2013 01 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,900 $13,000 Not Implemented
UM0400 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,437 $4,000 Not Implemented
UM0400 # 08 Y:2012 08 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,447 $4,000 Not Implemented
UM0400 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,660 $4,000 Not Implemented
UM0400 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $706 $10 Not Implemented
UM0400 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $3,287 $5,040 Not Implemented
UM0400 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,410 $200 Not Implemented