IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 336360 Motor Vehicle Seating and Interior Trim Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0003 # 07 Y:2017 07 2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,954 $10,000 Implemented
TR0003 # 06 Y:2017 06 2017 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,265 $449 Not Implemented
TR0003 # 05 Y:2017 05 2017 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $24,242 $38,964 Implemented
TR0003 # 04 Y:2017 04 2017 APPLY FOR INVESTMENT INCENTIVES $74,012 $15,000 Implemented
TR0003 # 03 Y:2017 03 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,334 $14,764 Not Implemented
TR0003 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,843 $2,000 Implemented
TR0003 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,044 $64,592 Implemented
IC0195 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,938 $3,125 Not Implemented
IC0195 # 11 Y:2017 11 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $697,569 $2,619,820 Not Implemented
IC0195 # 10 Y:2017 10 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,782 $11,163 Implemented
IC0195 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,417 $5,650 Implemented
IC0195 # 08 Y:2017 08 2017 UPGRADE CONTROLS ON COMPRESSORS $3,210 $2,555 Not Implemented
IC0195 # 07 Y:2017 07 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $32,126 $16,175 Not Implemented
IC0195 # 06 Y:2017 06 2017 REPLACE BOILER $183,000 $30,000 Implemented
IC0195 # 05 Y:2017 05 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $49 $6 Not Implemented
IC0195 # 04 Y:2017 04 2017 USE MINIMUM STEAM OPERATING PRESSURE $457 $0 Not Implemented
IC0195 # 03 Y:2017 03 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $881 $60 Not Implemented
IC0195 # 01 Y:2017 01 2017 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,465 $3,408 Not Implemented
UA0172 # 01 Y:2017 01 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,454 $37,500 Not Implemented
UA0172 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,564 $250 Not Implemented
UA0172 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,803 $2,670 Implemented
UA0172 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,901 $33,960 Not Implemented
UA0172 # 05 Y:2017 05 2017 INSTALL TIMERS AND/OR THERMOSTATS $6,624 $1,050 Implemented
UA0172 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $529 $210 Implemented