Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
515
matching recommendationsNAICS | 33637 | Motor Vehicle Metal Stamping |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0329 # 06 Y:2025 | 06 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $1,983 | $500 | n/a |
TT0329 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $566 | $600 | n/a |
TT0329 # 07 Y:2025 | 07 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,666 | $2,490 | n/a |
TT0329 # 02 Y:2025 | 02 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,292 | $5,000 | n/a |
TT0329 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT FOR HEAT | $77,572 | $478,110 | n/a |
TT0329 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,117 | $120 | n/a |
TT0329 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,210 | $275 | n/a |
TT0329 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,292 | $768 | n/a |
TT0321 # 11 Y:2025 | 11 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,173 | $0 | n/a |
TT0321 # 12 Y:2025 | 12 | 2025 | MINIMIZE WATER USAGE | $830 | $0 | n/a |
TT0321 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $28,035 | $28,125 | n/a |
TT0321 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT FOR HEAT | $71,296 | $345,600 | n/a |
TT0321 # 13 Y:2025 | 13 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $584 | $1,125 | n/a |
TT0321 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,594 | $2,250 | n/a |
TT0321 # 10 Y:2025 | 10 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,536 | $0 | n/a |
TT0321 # 04 Y:2025 | 04 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,473 | $10,000 | n/a |
TT0321 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,076 | $645 | n/a |
TT0321 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,797 | $3,000 | n/a |
TT0321 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,097 | $10,000 | n/a |
TT0321 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,906 | $3,825 | n/a |
TT0321 # 07 Y:2025 | 07 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,896 | $1,450 | n/a |
IP0201 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,678 | $1,198 | Not Implemented |
IP0201 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $55,084 | $0 | Not Implemented |
IP0201 # 07 Y:2024 | 07 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,237 | $2,101 | Not Implemented |
IP0201 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,830 | $25,000 | Not Implemented |