Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 33637 | Motor Vehicle Metal Stamping |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0511 # 01 Y:2015 | 01 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $34,159 | $150,000 | Not Implemented |
WV0511 # 13 Y:2015 | 13 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $500 | $1,000 | Implemented |
WV0511 # 12 Y:2015 | 12 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $759 | $30 | Implemented |
WV0511 # 11 Y:2015 | 11 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,478 | $677 | Implemented |
WV0511 # 10 Y:2015 | 10 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,475 | $618 | Implemented |
WV0511 # 09 Y:2015 | 09 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,429 | $15,050 | Not Implemented |
WV0511 # 08 Y:2015 | 08 | 2015 | FILTER AND REUSE HYDRAULIC OIL | $9,274 | $12,449 | Not Implemented |
WV0511 # 07 Y:2015 | 07 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,476 | $0 | Implemented |
WV0511 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,417 | $15,818 | Implemented |
WV0511 # 05 Y:2015 | 05 | 2015 | REDUCE VENTILATION AIR | $14,480 | $15,000 | Not Implemented |
WV0511 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,254 | $2,007 | Implemented |
WV0511 # 03 Y:2015 | 03 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $16,424 | $20,442 | Not Implemented |
WV0511 # 02 Y:2015 | 02 | 2015 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $19,864 | $40,000 | Not Implemented |
UD0920 # 01 Y:2015 | 01 | 2015 | COMBINE UTILITY METERS | $13,359 | $0 | Implemented |
UD0920 # 12 Y:2015 | 12 | 2015 | CONVERT TO AQUEOUS CLEANING SYSTEM | $6,095 | $7,375 | Implemented |
UD0920 # 11 Y:2015 | 11 | 2015 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $11,244 | $0 | Not Implemented |
UD0920 # 10 Y:2015 | 10 | 2015 | INSTALL OCCUPANCY SENSORS | $1,355 | $3,835 | Not Implemented |
UD0920 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,453 | $20,680 | Not Implemented |
UD0920 # 08 Y:2015 | 08 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,293 | $25,800 | Not Implemented |
UD0920 # 07 Y:2015 | 07 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,116 | $0 | Not Implemented |
UD0920 # 06 Y:2015 | 06 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $47,012 | $0 | Not Implemented |
UD0920 # 05 Y:2015 | 05 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,374 | $0 | Not Implemented |
UD0920 # 04 Y:2015 | 04 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,654 | $600 | Not Implemented |
UD0920 # 03 Y:2015 | 03 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $3,626 | $200 | Not Implemented |
UD0920 # 02 Y:2015 | 02 | 2015 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $1,749 | $0 | Not Implemented |