Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 336370 | Motor Vehicle Metal Stamping |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0201 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,830 | $25,000 | n/a |
IP0201 # 07 Y:2024 | 07 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,237 | $2,101 | n/a |
IP0201 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,678 | $1,198 | n/a |
IP0201 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,991 | $1,471 | n/a |
IP0201 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $133,638 | $39,257 | n/a |
IP0201 # 03 Y:2024 | 03 | 2024 | INSTALL SUB-METERING EQUIPMENT | $3,904 | $700 | n/a |
IP0201 # 02 Y:2024 | 02 | 2024 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,654 | $0 | n/a |
IP0201 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $55,084 | $0 | n/a |
IP0163 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,466 | $3,681 | Implemented |
IP0163 # 10 Y:2022 | 10 | 2022 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $4,458 | $8,975 | Not Implemented |
IP0163 # 09 Y:2022 | 09 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $640 | $674 | Implemented |
IP0163 # 08 Y:2022 | 08 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,345 | $2,259 | Implemented |
IP0163 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,570 | $851 | Implemented |
IP0163 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $712 | $72 | Implemented |
IP0163 # 04 Y:2022 | 04 | 2022 | USE PHOTOCELL CONTROLS | $2,682 | $248 | Implemented |
IP0163 # 03 Y:2022 | 03 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,306 | $3 | Implemented |
IP0163 # 02 Y:2022 | 02 | 2022 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $24,564 | $0 | Not Implemented |
IP0163 # 01 Y:2022 | 01 | 2022 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $241 | $0 | Implemented |
IP0137 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,249 | $0 | Implemented |
IP0137 # 08 Y:2020 | 08 | 2020 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $14,497 | $39,760 | Not Implemented |
IP0137 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,777 | $4,138 | Implemented |
IP0137 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $789 | $1,348 | Implemented |
IP0137 # 05 Y:2020 | 05 | 2020 | USE PHOTOCELL CONTROLS | $184 | $138 | Not Implemented |
IP0137 # 04 Y:2020 | 04 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,117 | $2,100 | Implemented |
IP0137 # 03 Y:2020 | 03 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $64,260 | $1,554 | Not Implemented |