Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
131
matching recommendationsNAICS | 336370 | Motor Vehicle Metal Stamping |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0043 # 01 Y:2023 | 01 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $116 | $319 | Not Implemented |
MU0043 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,700 | $7,887 | Not Implemented |
MU0043 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,957 | $2,281 | Not Implemented |
MU0043 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $228 | $480 | Implemented |
MU0043 # 05 Y:2023 | 05 | 2023 | KEEP EQUIPMENT CLEAN | $33 | $0 | Implemented |
MU0043 # 06 Y:2023 | 06 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,803 | $28,063 | Implemented |
MU0043 # 07 Y:2023 | 07 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $54 | $51 | Implemented |
MU0043 # 08 Y:2023 | 08 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,395 | $128,601 | Not Implemented |
MU0043 # 09 Y:2023 | 09 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,979 | $158,490 | Not Implemented |
MU0002 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,292 | $1,250 | Implemented |
MU0002 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $610 | $1,113 | Implemented |
MU0002 # 04 Y:2022 | 04 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,592 | $0 | Not Implemented |
MU0002 # 05 Y:2022 | 05 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $701 | $0 | Implemented |
MU0002 # 06 Y:2022 | 06 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $47,027 | $242,692 | Implemented |
MU0002 # 07 Y:2022 | 07 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $17,145 | $16,000 | Implemented |
MU0002 # 08 Y:2022 | 08 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $1,961 | $3,045 | Implemented |
MU0002 # 01 Y:2022 | 01 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,933 | $0 | Implemented |
UM0469 # 05 Y:2016 | 05 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $601 | $1,000 | Not Implemented |
UM0469 # 04 Y:2016 | 04 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,415 | $1,500 | Not Implemented |
UM0469 # 03 Y:2016 | 03 | 2016 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $7,961 | $20,000 | Not Implemented |
UM0469 # 02 Y:2016 | 02 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,118 | $5,200 | Not Implemented |
UM0469 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,139 | $1,000 | Not Implemented |
UM0451 # 04 Y:2014 | 04 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,930 | $6,000 | Not Implemented |
UM0451 # 01 Y:2014 | 01 | 2014 | OPTIMIZE PLANT POWER FACTOR | $16,165 | $25,000 | Implemented |
UM0451 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $6,320 | $4,800 | Implemented |