IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,229

matching recommendations
Reset
NAICS 33639 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0167 # 02 Y:2016 02 2016 OPTIMIZE PLANT POWER FACTOR $27,708 $28,000 Implemented
TT0167 # 03 Y:2016 03 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,627 $5,200 Not Implemented
TT0167 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,188 $170,642 Implemented
TT0167 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,407 $125 Implemented
TT0167 # 06 Y:2016 06 2016 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $5,213 $900 Not Implemented
TT0167 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,887 $3,000 Implemented
TT0167 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,764 $500 Implemented
TT0167 # 09 Y:2016 09 2016 INSTALL TIMERS AND/OR THERMOSTATS $1,481 $500 Not Implemented
TT0167 # 10 Y:2016 10 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $815 $2,500 Not Implemented
UA0155 # 01 Y:2016 01 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $61,044 $120 Not Implemented
UA0155 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,730 $50,000 Not Implemented
UA0155 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,633 $100 Implemented
UA0155 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,924 $2,995 Not Implemented
UA0155 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,574 $0 Implemented
UA0155 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,826 $2,520 Implemented
UA0155 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $7,261 $5,208 Not Implemented
UA0155 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,480 $15,842 Not Implemented
UA0155 # 09 Y:2016 09 2016 USE PHOTOCELL CONTROLS $607 $582 Not Implemented
UM0463 # 01 Y:2015 01 2015 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,052,850 $1,822,453 Not Implemented
UM0463 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150,724 $565,274 Implemented
UM0463 # 03 Y:2015 03 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,674 $4,000 Not Implemented
UM0463 # 04 Y:2015 04 2015 CONVERT TO OXYFUEL BURNERS $3,052,580 $1,000,000 Not Implemented
UA0147 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,366 $72,811 Not Implemented
UA0147 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,680 $1,096 Not Implemented
UA0147 # 03 Y:2015 03 2015 USE PHOTOCELL CONTROLS $46 $117 Implemented