IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,252

matching recommendations
Reset
NAICS 33639 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0175 # 08 Y:2016 08 2016 USE OPTIMUM THICKNESS INSULATION $1,726 $375 Not Implemented
TT0175 # 09 Y:2016 09 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,155 $200 Implemented
TT0172 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,170 $114,000 Not Implemented
TT0172 # 02 Y:2016 02 2016 INSTALL TIMERS AND/OR THERMOSTATS $27,275 $393 Not Implemented
TT0172 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,196 $25,500 Not Implemented
TT0172 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,632 $2,000 Not Implemented
TT0172 # 05 Y:2016 05 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,023 $1,000 Not Implemented
TT0172 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,611 $3,000 Not Implemented
MI0297 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $97,105 $82,600 Not Implemented
MI0297 # 02 Y:2016 02 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $65,063 $200,000 Not Implemented
MI0297 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $40,957 $1,120 Not Implemented
MI0297 # 04 Y:2016 04 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $27,925 $1,400 Not Implemented
MI0297 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $23,144 $7,000 Implemented
MI0297 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,747 $40 Not Implemented
MI0297 # 07 Y:2016 07 2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $21,352 $22,281 Implemented
MI0297 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,133 $1,660 Implemented
MI0297 # 09 Y:2016 09 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $9,631 $16,156 Not Implemented
MI0297 # 10 Y:2016 10 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,934 $10,031 Not Implemented
MI0297 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $5,116 $884 Not Implemented
MI0297 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,442 $2,628 Implemented
MI0297 # 13 Y:2016 13 2016 USE PHOTOCELL CONTROLS $781 $240 Not Implemented
MI0297 # 14 Y:2016 14 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $335 $944 Implemented
TT0167 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,026 $4,452 Not Implemented
TT0167 # 02 Y:2016 02 2016 OPTIMIZE PLANT POWER FACTOR $27,708 $28,000 Implemented
TT0167 # 03 Y:2016 03 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,627 $5,200 Not Implemented