IAC Assessment: UD0959
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0959
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2017
Principal Product Sub assembly logistics
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 339
Plant Area (Sq.Ft.) 1,342,569
Annual Production 2,375,000 Pieces
Production Hrs. Annual 4,250
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $435,229 9,347,193 kWh $0.05
Electricity Demand $395,131 17,292 kW-months/year $22.85
Electricity Fees $5,012 - $ -
Natural Gas $303,416 45,614 MMBtu $6.65
TOTAL ENERGY COSTS $1,138,788
RECOMMENDED SAVINGS* $275,806 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,793
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Personnel Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$114,753
Cost:
-
$1,198 34,588 $119,036 16,602 - - $(-5,481) (-362) - - $1,198
34,588
kWh
$119,036
16,602
kW-months/year
-
-
MMBtu
$(-5,481)
(-362)
MMBtu
-
-
$
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$19,894
Cost:
$39,000
$16,449 475,000 $24,372 2,400 $(-20,927) (-3,147) - - - - $16,449
475,000
kWh
$24,372
2,400
kW-months/year
$(-20,927)
(-3,147)
MMBtu
-
-
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$18,841
Cost:
-
$116 3,345 $19,188 2,676 - - - - $(-463) - $116
3,345
kWh
$19,188
2,676
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-463)
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$12,612
Cost:
$68,240
$5,804 167,607 $6,808 335 - - - - - - $5,804
167,607
kWh
$6,808
335
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$14,215
Cost:
$15,000
$(-53) (-1,538) $(-25) (-2) $14,293 2,149 - - - - $(-53)
(-1,538)
kWh
$(-25)
(-2)
kW-months/year
$14,293
2,149
MMBtu
-
-
MMBtu
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$11,843
Cost:
-
$11,843 342,000 - - - - - - - - $11,843
342,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,881
Cost:
$10,000
$3,200 92,399 $2,681 132 - - - - - - $3,200
92,399
kWh
$2,681
132
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,551
Cost:
$1,000
$844 24,360 $707 35 - - - - - - $844
24,360
kWh
$707
35
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$78
Cost:
-
$29 850 $49 2 - - - - - - $29
850
kWh
$49
2
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.7314 REDUCE VENTILATION AIR Savings:
$19,897
Cost:
$10,500
$1,542 44,535 $280 78 $18,075 2,718 - - - - $1,542
44,535
kWh
$280
78
kW-months/year
$18,075
2,718
MMBtu
-
-
MMBtu
-
-
$
11: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$6,411
Cost:
$23,750
$512 14,777 - - $5,899 887 - - - - $512
14,777
kWh
-
-
kW-months/year
$5,899
887
MMBtu
-
-
MMBtu
-
-
$
12: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$5,300
Cost:
-
- - - - $5,300 797 - - - - -
-
kWh
-
-
kW-months/year
$5,300
797
MMBtu
-
-
MMBtu
-
-
$
13: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$14,374
Cost:
$25,987
$11,923 344,310 - - - - - - $2,451 - $11,923
344,310
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$2,451
-
$
14: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,523
Cost:
$139
$725 20,939 $695 34 - - - - $103 - $725
20,939
kWh
$695
34
kW-months/year
-
-
MMBtu
-
-
MMBtu
$103
-
$
15: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,991
Cost:
$14,214
$2,677 77,312 $2,151 106 - - - - $(-837) - $2,677
77,312
kWh
$2,151
106
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-837)
-
$
16: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,642
Cost:
$41,348
$12,631 364,756 $12,105 596 - - - - $(-94) - $12,631
364,756
kWh
$12,105
596
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-94)
-
$
TOTAL RECOMMENDED Savings:
$275,806
Cost:
$249,178
$69,440 2,005,240 $188,047 22,995 $22,640 3,404 $(-5,481) (-362) $1,160 - $69,440
2,005,240
kWh
$188,047
22,995
kW-months/year
$22,640
3,404
MMBtu
$(-5,481)
(-362)
MMBtu
$1,160
-
$
TOTAL IMPLEMENTED Savings:
$21,793
Cost:
$24,214
$17,749 512,561 $4,881 240 - - - - $(-837) - $17,749
512,561
kWh
$4,881
240
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-837)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Personnel Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Personnel Changes