IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,252

matching recommendations
Reset
NAICS 33639 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0740 # 10 Y:2006 10 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,805 $1,500 Implemented
UD0740 # 11 Y:2006 11 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,326 $1,700 Implemented
UD0740 # 12 Y:2006 12 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,280 $0 Implemented
UD0740 # 13 Y:2006 13 2006 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $223 $0 Implemented
BD0305 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $96,779 $48,000 Implemented
BD0305 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,132 $1,000 Implemented
BD0305 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $2,072 $225 Not Implemented
BD0305 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $789 $3,540 Not Implemented
BD0305 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $638 $0 Not Implemented
BD0305 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $230 $300 Not Implemented
UM0297 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,060 $2,000 Not Implemented
UM0297 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $6,448 $9,089 Not Implemented
UM0297 # 03 Y:2006 03 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $6,156 $3,450 Implemented
UM0297 # 04 Y:2006 04 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,502 $3,900 Not Implemented
UM0297 # 05 Y:2006 05 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,020 $872 Implemented
UM0297 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,215 $6,601 Implemented
IC0109 # 01 Y:2005 01 2005 MODIFY WORKLOAD $25,000 $0 Implemented
IC0109 # 02 Y:2005 02 2005 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $437,212 $3,259,200 Not Implemented
IC0109 # 03 Y:2005 03 2005 REPLACE BOILER $294,938 $501,372 Not Implemented
IC0109 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,632 $22,464 Not Implemented
IC0109 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $1,239 $400 Implemented
IC0109 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $37,809 $131,160 Not Implemented
IC0109 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,496 $2,100 Implemented
UD0725 # 01 Y:2005 01 2005 RECOVER AND REUSE WASTE MATERIAL $45,000 $50,000 Not Implemented
UD0725 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,989 $792 Not Implemented