Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
59
matching recommendationsNAICS | 33639 | Other Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0059 # 04 Y:2024 | 04 | 2024 | METER WASTE WATER | $5,966 | $1,570 | n/a |
TR0059 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $148,771 | $739,065 | n/a |
TR0059 # 03 Y:2024 | 03 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $18,395 | $4,000 | n/a |
TR0059 # 01 Y:2024 | 01 | 2024 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $36,781 | $32,522 | n/a |
AM0742 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,320 | $4,200 | Not Implemented |
AM0742 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $670 | $1,200 | Not Implemented |
AM0742 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $880 | $5 | Implemented |
AM0742 # 02 Y:2018 | 02 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,650 | $600 | Implemented |
AM0742 # 01 Y:2018 | 01 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,300 | $0 | Implemented |
TR0006 # 05 Y:2017 | 05 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,005 | $208 | n/a |
TR0006 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $271 | $279 | n/a |
TR0006 # 04 Y:2017 | 04 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $31,644 | $0 | n/a |
TR0006 # 07 Y:2017 | 07 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,119 | $3,360 | n/a |
TR0006 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $5,324 | $88 | n/a |
TR0006 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,038 | $21,816 | n/a |
TR0006 # 08 Y:2017 | 08 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $23,655 | $0 | n/a |
TR0006 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $117,470 | $11,908 | n/a |
AM0726 # 02 Y:2017 | 02 | 2017 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $13,960 | $1,200 | Implemented |
AM0726 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $155 | $220 | Not Implemented |
AM0726 # 06 Y:2017 | 06 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,185 | $265 | Not Implemented |
AM0726 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,305 | $6,120 | Implemented |
AM0726 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $13,440 | $1,904 | Implemented |
AM0726 # 03 Y:2017 | 03 | 2017 | PAY UTILITY BILLS ON TIME | $15,714 | $0 | Not Implemented |
AM0726 # 01 Y:2017 | 01 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $268,194 | $100,000 | Not Implemented |
TA0079 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,280 | $720 | Implemented |