IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,244

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0155 # 02 Y:2016 02 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $19,730 $50,000 Not Implemented
UA0155 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,633 $100 Implemented
UA0155 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,924 $2,995 Not Implemented
UA0155 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,574 $0 Implemented
UA0155 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,826 $2,520 Implemented
UA0155 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $7,261 $5,208 Not Implemented
UA0155 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,480 $15,842 Not Implemented
UA0155 # 09 Y:2016 09 2016 USE PHOTOCELL CONTROLS $607 $582 Not Implemented
UM0463 # 01 Y:2015 01 2015 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,052,850 $1,822,453 Not Implemented
UM0463 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150,724 $565,274 Implemented
UM0463 # 03 Y:2015 03 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,674 $4,000 Not Implemented
UM0463 # 04 Y:2015 04 2015 CONVERT TO OXYFUEL BURNERS $3,052,580 $1,000,000 Not Implemented
UA0147 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,366 $72,811 Not Implemented
UA0147 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,680 $1,096 Not Implemented
UA0147 # 03 Y:2015 03 2015 USE PHOTOCELL CONTROLS $46 $117 Implemented
UA0147 # 04 Y:2015 04 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,593 $1,875 Not Implemented
UA0147 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $960 $1,930 Implemented
UA0147 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $320 $100 Not Implemented
UA0147 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $539 $2,535 Not Implemented
UA0147 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $278 $225 Implemented
UA0143 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,525 $16,630 Not Implemented
UA0143 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,099 $800 Implemented
UA0143 # 03 Y:2015 03 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,022 $25,000 Not Implemented
UA0143 # 04 Y:2015 04 2015 OPTIMIZE PLANT POWER FACTOR $1,140 $2,140 Not Implemented
UA0143 # 05 Y:2015 05 2015 USE PHOTOCELL CONTROLS $458 $959 Not Implemented