IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,252

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0046 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $2,310 $0 Implemented
TA0046 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,030 $0 Not Implemented
TA0046 # 10 Y:2003 10 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,270 $0 Implemented
TA0046 # 11 Y:2003 11 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,500 $0 Implemented
TA0046 # 12 Y:2003 12 2003 INSTALL OCCUPANCY SENSORS $1,050 $406 Implemented
TA0046 # 13 Y:2003 13 2003 INSULATE BARE EQUIPMENT $895 $225 Not Implemented
TA0046 # 14 Y:2003 14 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $610 $180 Not Implemented
TA0046 # 15 Y:2003 15 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $330 $120 Not Implemented
TA0046 # 16 Y:2003 16 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $195 $120 Not Implemented
SF0242 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,642 $300 Implemented
SF0242 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,176 $572 Implemented
SF0242 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,518 $1,217 Implemented
SF0242 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,397 $3,036 Not Implemented
SF0242 # 05 Y:2002 05 2002 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $553 $1,000 Not Implemented
SF0242 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $2,020 $3,067 Not Implemented
SF0242 # 07 Y:2002 07 2002 USE PHOTOCELL CONTROLS $433 $1,200 Not Implemented
SF0242 # 08 Y:2002 08 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,216 $16,216 Not Implemented
UM0221 # 01 Y:2002 01 2002 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $40,400 $4,000 Implemented
UM0221 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,486 $7,425 Implemented
UM0221 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $8,720 $2,000 Not Implemented
UM0221 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,700 $1,250 Implemented
UM0221 # 05 Y:2002 05 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,750 $12,870 Not Implemented
UM0221 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,580 $42,883 Not Implemented
UM0221 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,650 $2,000 Not Implemented
UM0221 # 08 Y:2002 08 2002 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,075 $3,000 Not Implemented