IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0229 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,190 $13,430 Not Implemented
TT0229 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $8,523 $15,000 Not Implemented
TT0229 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $5,315 $24,000 Not Implemented
TT0229 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,772 $12,000 Not Implemented
TT0229 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,229 $9,752 Implemented
TT0229 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,943 $5,000 Not Implemented
TT0206 # 02 Y:2018 02 2018 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $6,182 $25 Not Implemented
TT0206 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,406 $32,616 Not Implemented
TT0206 # 03 Y:2018 03 2018 INSTALL TIMERS AND/OR THERMOSTATS $428 $150 Not Implemented
TT0175 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $40,909 $94,503 Not Implemented
TT0175 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,500 $6,820 Not Implemented
TT0175 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,579 $23,120 Not Implemented
TT0175 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $12,631 $125 Implemented
TT0175 # 08 Y:2016 08 2016 USE OPTIMUM THICKNESS INSULATION $1,726 $375 Not Implemented
TT0175 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,213 $25 Implemented
TT0175 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,832 $2,400 Not Implemented
TT0175 # 09 Y:2016 09 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,155 $200 Implemented
TT0175 # 06 Y:2016 06 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,374 $400 Implemented
TT0172 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,611 $3,000 Not Implemented
TT0172 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,170 $114,000 Not Implemented
TT0172 # 02 Y:2016 02 2016 INSTALL TIMERS AND/OR THERMOSTATS $27,275 $393 Not Implemented
TT0172 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,196 $25,500 Not Implemented
TT0172 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,632 $2,000 Not Implemented
TT0172 # 05 Y:2016 05 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,023 $1,000 Not Implemented
TT0167 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,188 $170,642 Implemented