IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
NAICS 336390 Other Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0059 # 04 Y:2024 04 2024 METER WASTE WATER $5,966 $1,570 n/a
TR0059 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $148,771 $739,065 n/a
TR0059 # 03 Y:2024 03 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,395 $4,000 n/a
TR0059 # 01 Y:2024 01 2024 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $36,781 $32,522 n/a
AM0742 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,320 $4,200 Not Implemented
AM0742 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $670 $1,200 Not Implemented
AM0742 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $880 $5 Implemented
AM0742 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,650 $600 Implemented
AM0742 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,300 $0 Implemented
TR0006 # 05 Y:2017 05 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,005 $208 n/a
TR0006 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $271 $279 n/a
TR0006 # 04 Y:2017 04 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $31,644 $0 n/a
TR0006 # 07 Y:2017 07 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,119 $3,360 n/a
TR0006 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $5,324 $88 n/a
TR0006 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,038 $21,816 n/a
TR0006 # 08 Y:2017 08 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $23,655 $0 n/a
TR0006 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $117,470 $11,908 n/a
AM0726 # 02 Y:2017 02 2017 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $13,960 $1,200 Implemented
AM0726 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $155 $220 Not Implemented
AM0726 # 06 Y:2017 06 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,185 $265 Not Implemented
AM0726 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,305 $6,120 Implemented
AM0726 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $13,440 $1,904 Implemented
AM0726 # 03 Y:2017 03 2017 PAY UTILITY BILLS ON TIME $15,714 $0 Not Implemented
AM0726 # 01 Y:2017 01 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $268,194 $100,000 Not Implemented
TA0079 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,280 $720 Implemented