IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0019 # 04 Y:2023 04 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,992 $8,890 n/a
CI0019 # 05 Y:2023 05 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,769 $3,500 n/a
CI0019 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,444 $200 n/a
CI0019 # 07 Y:2023 07 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,159 $1,500 n/a
CI0019 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $851 $1,500 n/a
SF0597 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $53,882 $13,192 Implemented
SF0597 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,268 $0 Implemented
SF0597 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $706 $200 Not Implemented
SF0597 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $322,164 $2,251,041 Implemented
SF0597 # 02 Y:2023 02 2023 ADD AREA LIGHTING SWITCHES $11,388 $100 Implemented
CI0001 # 04 Y:2022 04 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,151 $100 Not Implemented
CI0001 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,056 $750 Implemented
CI0001 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $16,299 $3,500 Not Implemented
CI0001 # 07 Y:2022 07 2022 USE PHOTOCELL CONTROLS $1,147 $1,440 Not Implemented
CI0001 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,304 $25 Not Implemented
CI0001 # 05 Y:2022 05 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,000 $5,000 Not Implemented
CI0001 # 03 Y:2022 03 2022 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $5,122 $6,000 Not Implemented
SD0613 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $218 $2,500 Implemented
SD0613 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,201 $1,065 Implemented
SD0613 # 02 Y:2021 02 2021 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $8,370 $5,000 Implemented
SD0613 # 01 Y:2021 01 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,677 $16,500 Implemented
SD0613 # 04 Y:2021 04 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $590 $1,500 Not Implemented
SD0605 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $804 $1,696 Implemented
SD0605 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,006 $2,850 Not Implemented
SD0605 # 07 Y:2020 07 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $639 $2,000 Not Implemented