Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
171
matching recommendationsNAICS | 3364 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0019 # 04 Y:2023 | 04 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $6,992 | $8,890 | n/a |
CI0019 # 05 Y:2023 | 05 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,769 | $3,500 | n/a |
CI0019 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,444 | $200 | n/a |
CI0019 # 07 Y:2023 | 07 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,159 | $1,500 | n/a |
CI0019 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $851 | $1,500 | n/a |
SF0597 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $53,882 | $13,192 | Implemented |
SF0597 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,268 | $0 | Implemented |
SF0597 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $706 | $200 | Not Implemented |
SF0597 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $322,164 | $2,251,041 | Implemented |
SF0597 # 02 Y:2023 | 02 | 2023 | ADD AREA LIGHTING SWITCHES | $11,388 | $100 | Implemented |
CI0001 # 04 Y:2022 | 04 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,151 | $100 | Not Implemented |
CI0001 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,056 | $750 | Implemented |
CI0001 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,299 | $3,500 | Not Implemented |
CI0001 # 07 Y:2022 | 07 | 2022 | USE PHOTOCELL CONTROLS | $1,147 | $1,440 | Not Implemented |
CI0001 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,304 | $25 | Not Implemented |
CI0001 # 05 Y:2022 | 05 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,000 | $5,000 | Not Implemented |
CI0001 # 03 Y:2022 | 03 | 2022 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $5,122 | $6,000 | Not Implemented |
SD0613 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $218 | $2,500 | Implemented |
SD0613 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,201 | $1,065 | Implemented |
SD0613 # 02 Y:2021 | 02 | 2021 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $8,370 | $5,000 | Implemented |
SD0613 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,677 | $16,500 | Implemented |
SD0613 # 04 Y:2021 | 04 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $590 | $1,500 | Not Implemented |
SD0605 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $804 | $1,696 | Implemented |
SD0605 # 02 Y:2020 | 02 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,006 | $2,850 | Not Implemented |
SD0605 # 07 Y:2020 | 07 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $639 | $2,000 | Not Implemented |