IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

221

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0384 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,477 $8,668 Implemented
MI0382 # 07 Y:2020 07 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $964 $1,884 Implemented
MI0382 # 06 Y:2020 06 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,088 $1,306 Not Implemented
MI0382 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,278 $3,204 Implemented
MI0382 # 01 Y:2020 01 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,223 $3,645 Not Implemented
MI0382 # 02 Y:2020 02 2020 USE SOLAR HEAT TO HEAT WATER $7,209 $8,409 Not Implemented
MI0382 # 03 Y:2020 03 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,430 $2,740 Not Implemented
MI0382 # 04 Y:2020 04 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,045 $1,796 Not Implemented
MI0381 # 01 Y:2020 01 2020 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $23,304 $57,960 Not Implemented
MI0381 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,914 $860 Implemented
MI0381 # 03 Y:2020 03 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,145 $2,400 Not Implemented
MI0381 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,241 $555 Implemented
MI0381 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,735 $980 Implemented
MI0381 # 06 Y:2020 06 2020 KEEP BOILER TUBES CLEAN $2,320 $3,500 Not Implemented
MI0381 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,688 $4,905 Implemented
MI0376 # 07 Y:2020 07 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $3,944 $440 Not Implemented
MI0376 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $234,414 $800 Not Implemented
MI0376 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $763 $289 Not Implemented
MI0376 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,838 $9,120 Implemented
MI0376 # 05 Y:2020 05 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $6,695 $5,875 Not Implemented
MI0376 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $55,477 $1,980 Not Implemented
MI0376 # 04 Y:2020 04 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $25,854 $580 Not Implemented
MI0376 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $205,000 $1,013,224 Not Implemented
MI0367 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,815 $120 Implemented
MI0367 # 02 Y:2020 02 2020 USE BATTERY STORAGE FOR DEMAND CONTROL $21,335 $38,237 Not Implemented