IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,719

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0672 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,885 $6,844 Not Implemented
OK0672 # 02 Y:2003 02 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $28,340 $0 Not Implemented
OK0672 # 03 Y:2003 03 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,626 $2,000 Implemented
OK0672 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,333 $145 Not Implemented
OK0672 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,041 $0 Not Implemented
OK0672 # 06 Y:2003 06 2003 OPTIMIZE PLANT POWER FACTOR $1,292 $8,190 Not Implemented
OK0672 # 07 Y:2003 07 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,225 $262 Implemented
OK0672 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,952 $28,902 Not Implemented
OK0672 # 09 Y:2003 09 2003 INSTALL OCCUPANCY SENSORS $578 $488 Not Implemented
UU0051 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,232 $0 Not Implemented
UU0051 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $744 $340 Not Implemented
UU0051 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,845 $961 Not Implemented
UU0051 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,130 $11,800 Not Implemented
UU0051 # 05 Y:2003 05 2003 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,823 $0 Not Implemented
UU0051 # 06 Y:2003 06 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,510 $5,980 Not Implemented
UU0051 # 07 Y:2003 07 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,270 $8,450 Not Implemented
LM0063 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,244 $140 Implemented
LM0063 # 02 Y:2003 02 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,129 $0 Implemented
LM0063 # 03 Y:2003 03 2003 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $80 $30 Implemented
LM0063 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $828 $232 Implemented
LM0063 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $68 $85 Not Implemented
UD0668 # 01 Y:2003 01 2003 CHECK FOR ACCURACY OF UTILITY / POWER METERS $48,976 $0 Not Implemented
UD0668 # 02 Y:2003 02 2003 IMPROVE SPACE COMFORT CONDITIONING $40,000 $44,000 Not Implemented
UD0668 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,018 $37,750 Not Implemented
UD0668 # 04 Y:2003 04 2003 ADD AREA LIGHTING SWITCHES $11,320 $7,350 Not Implemented