Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,719
matching recommendationsNAICS | 3364 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0648 # 09 Y:2024 | 09 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $364,878 | $49,250 | Not Implemented |
SD0648 # 10 Y:2024 | 10 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,121 | $10,016 | Implemented |
SD0648 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,340 | $15,608 | Implemented |
SD0648 # 12 Y:2024 | 12 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $982,749 | $783,575 | Not Implemented |
SD0648 # 13 Y:2024 | 13 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $793 | $1,336 | Implemented |
UW2319 # 01 Y:2023 | 01 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $56,470 | $23,651 | Not Implemented |
UW2319 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,837 | $2,080 | Not Implemented |
UW2319 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,001 | $2,820 | Not Implemented |
UW2319 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,443 | $68,000 | Not Implemented |
UW2319 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,789 | $3,000 | Not Implemented |
UW2319 # 06 Y:2023 | 06 | 2023 | USER BATTERY STORAGE FOR POWER QUALITY ISSUES | $750,000 | $871,000 | Not Implemented |
UA0281 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $18,036 | $12,615 | n/a |
UA0281 # 02 Y:2023 | 02 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $14,808 | $5,698 | n/a |
UA0281 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,375 | $1,000 | n/a |
UA0281 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,484 | $8,591 | n/a |
UA0281 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $56,035 | $68,083 | n/a |
UA0281 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $6,060 | $1,885 | n/a |
UA0281 # 07 Y:2023 | 07 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,437 | $26,750 | n/a |
UA0281 # 08 Y:2023 | 08 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $21,490 | $49,464 | n/a |
UA0281 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,483 | $47,040 | n/a |
UA0281 # 10 Y:2023 | 10 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,002 | $15,154 | n/a |
NT0020 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,491 | $4,553 | Implemented |
NT0020 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,251 | $0 | Implemented |
NT0020 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,277 | $33,920 | Not Implemented |
NT0020 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $3,147 | $11,909 | Not Implemented |