IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 3364 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0244 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,228 $517 Implemented
IC0244 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,307 $4,150 Implemented
IC0244 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $534 Not Implemented
IC0244 # 04 Y:2020 04 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,190 $6,120 Not Implemented
BD0465 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $256 $305 Implemented
BD0465 # 06 Y:2015 06 2015 RECOVER WASTE HEAT FROM EQUIPMENT $330 $800 Implemented
BD0465 # 05 Y:2015 05 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $837 $648 Implemented
BD0465 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $906 $1,200 Implemented
BD0465 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $3,705 Implemented
BD0465 # 09 Y:2015 09 2015 ADOPT IN-HOUSE MATERIAL GENERATION $7,962 $22,000 Not Implemented
BD0465 # 08 Y:2015 08 2015 CLEAR AND RENT EXISTING SPACE $71,910 $2,000 Implemented
BD0465 # 02 Y:2015 02 2015 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $11,490 $62,000 Implemented
BD0465 # 01 Y:2015 01 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,916 $28,000 Not Implemented
BD0417 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $889 $10 Not Implemented
BD0417 # 07 Y:2012 07 2012 USE PHOTOCELL CONTROLS $190 $50 Not Implemented
BD0417 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $1,124 $375 Implemented
BD0417 # 05 Y:2012 05 2012 USE SYNTHETIC LUBRICANT $1,301 $500 Not Implemented
BD0417 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $38,469 $5,000 Implemented
BD0417 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,168 $300 Not Implemented
BD0417 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $661 $966 Implemented
BD0379 # 01 Y:2010 01 2010 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $43,359 $156,000 Not Implemented
BD0379 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $198 $350 n/a
BD0379 # 05 Y:2010 05 2010 USE SYNTHETIC LUBRICANT $1,393 $300 Not Implemented
BD0379 # 03 Y:2010 03 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $10,691 $14,000 Not Implemented
BD0379 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $12,675 $5,775 n/a