Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2010 |
Principal Product | Turbine engine components |
NAICS | 336412 - Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724 - Aircraft Engines And Engine Parts |
Sales | $10,000,000-$50,000,000 |
# of Employees | 380 |
Plant Area (Sq.Ft.) | 89,000 |
Annual Production | 1 Units |
Production Hrs. Annual | 6,240 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $250,078 | 7,800,622 | kWh | $0.03 |
Electricity Demand | $84,386 | 15,780 | kW-months/year | $5.35 |
Electricity Fees | $41,695 | - | $ | - |
Natural Gas | $37,232 | 2,661 | MMBtu | $13.99 |
LPG | $60,000 | 2,748 | MMBtu | $21.83 |
TOTAL ENERGY COSTS | $504,420 | |||
RECOMMENDED SAVINGS* | $86,638 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | LPG | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION |
Savings: $43,359 Cost: $156,000 |
$(-8,545) | (-270,400) | $(-8,096) | (-1,560) | $60,000 | 2,748 | - | - | - | - | - | - |
$(-8,545) (-270,400) kWh |
$(-8,096) (-1,560) kW-months/year |
$60,000 2,748 MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $12,675 Cost: $5,775 |
$9,193 | 290,906 | $3,482 | 671 | - | - | - | - | - | - | - | - |
$9,193 290,906 kWh |
$3,482 671 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $10,691 Cost: $14,000 |
$10,691 | 222,700 | - | - | - | - | - | - | - | - | - | - |
$10,691 222,700 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $8,550 Cost: $8,550 |
$6,498 | 205,629 | $2,052 | 395 | - | - | - | - | - | - | - | - |
$6,498 205,629 kWh |
$2,052 395 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,393 Cost: $300 |
$1,059 | 33,516 | $334 | 65 | - | - | - | - | - | - | - | - |
$1,059 33,516 kWh |
$334 65 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $198 Cost: $350 |
$105 | 3,328 | $24 | 5 | - | - | - | - | $29 | - | $40 | - |
$105 3,328 kWh |
$24 5 kW-months/year |
- - MMBtu |
- - gal |
$29 - $ |
$40 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $6,893 Cost: $300 |
- | - | $6,893 | 1,328 | - | - | - | - | - | - | - | - |
- - kWh |
$6,893 1,328 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS |
Savings: $2,879 Cost: $1,680 |
$(-21) | (-3,633) | - | - | - | - | $4,200 | 1,512 | $(-1,300) | - | - | - |
$(-21) (-3,633) kWh |
- - kW-months/year |
- - MMBtu |
$4,200 1,512 gal |
$(-1,300) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $86,638 Cost: $186,955 |
$18,980 | 482,046 | $4,689 | 904 | $60,000 | 2,748 | $4,200 | 1,512 | $(-1,271) | - | $40 | - | $18,980 482,046 kWh |
$4,689 904 kW-months/year |
$60,000 2,748 MMBtu |
$4,200 1,512 gal |
$(-1,271) - $ |
$40 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | LPG | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost |