IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,597

matching recommendations
Reset
NAICS 33641 Aerospace Product and Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2311 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,427 $15,722 n/a
UW2311 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,668 $83,148 n/a
UW2311 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $2,080 n/a
UW2311 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $112,574 $693,588 n/a
UW2311 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $11,250 $49,905 n/a
UW2310 # 01 Y:2023 01 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $29,254 $128,809 n/a
UW2310 # 02 Y:2023 02 2023 UPGRADE OBSOLETE EQUIPMENT $153,154 $859,050 n/a
UW2310 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,425 $1,000 n/a
UW2310 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,210 $16,378 n/a
CI0019 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $851 $1,500 n/a
CI0019 # 07 Y:2023 07 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,159 $1,500 n/a
CI0019 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,444 $200 n/a
CI0019 # 05 Y:2023 05 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,769 $3,500 n/a
CI0019 # 04 Y:2023 04 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,992 $8,890 n/a
CI0019 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,792 $2,500 n/a
CI0019 # 02 Y:2023 02 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $42,450 $24,000 n/a
CI0019 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $70,514 $548,740 n/a
GT0969 # 10 Y:2023 10 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $59,198 $494,048 n/a
GT0969 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,558 $49,875 n/a
GT0969 # 08 Y:2023 08 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $389 $270 n/a
GT0969 # 07 Y:2023 07 2023 PAY UTILITY BILLS ON TIME $419 $200 n/a
GT0969 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,639 $1,200 n/a
GT0969 # 05 Y:2023 05 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,944 $1,950 n/a
GT0969 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,439 $1,850 n/a
GT0969 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $929 $200 n/a