Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
171
matching recommendationsNAICS | 33641 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0528 # 09 Y:2016 | 09 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,286 | $4,076 | Not Implemented |
SD0528 # 10 Y:2016 | 10 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,512 | $200 | Not Implemented |
SD0528 # 11 Y:2016 | 11 | 2016 | USE PHOTOCELL CONTROLS | $157 | $185 | Not Implemented |
SD0486 # 01 Y:2014 | 01 | 2014 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $75,586 | $286,300 | Not Implemented |
SD0486 # 02 Y:2014 | 02 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $54,581 | $250,000 | Not Implemented |
SD0486 # 03 Y:2014 | 03 | 2014 | REDUCE SCRAP PRODUCTION | $29,967 | $30,993 | Not Implemented |
SD0486 # 04 Y:2014 | 04 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,957 | $4,985 | Not Implemented |
SD0486 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,274 | $22,000 | Not Implemented |
SD0486 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,270 | $600 | Not Implemented |
SD0486 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $600 | Not Implemented |
SD0479 # 01 Y:2014 | 01 | 2014 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $360,753 | $1,272,000 | Not Implemented |
SD0479 # 02 Y:2014 | 02 | 2014 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $67,610 | $30,440 | Not Implemented |
SD0479 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,591 | $59,600 | Implemented |
SD0479 # 04 Y:2014 | 04 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $28,012 | $38,000 | Not Implemented |
SD0479 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,299 | $21,315 | Implemented |
SD0479 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,525 | $2,865 | Not Implemented |
SD0480 # 01 Y:2014 | 01 | 2014 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $102,356 | $456,500 | Not Implemented |
SD0480 # 02 Y:2014 | 02 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $58,476 | $249,000 | Not Implemented |
SD0480 # 03 Y:2014 | 03 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,051 | $52,333 | Not Implemented |
SD0480 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,662 | $300 | Implemented |
SD0480 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,971 | $5,075 | Not Implemented |
SD0480 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,686 | $4,500 | Not Implemented |
SD0480 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,176 | $3,050 | Not Implemented |
SD0480 # 08 Y:2014 | 08 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $634 | $370 | Not Implemented |
SD0473 # 01 Y:2013 | 01 | 2013 | INSULATE BARE EQUIPMENT | $13,184 | $13,290 | Implemented |