IAC Assessment: SD0565
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0565
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2018
Principal Product Aerospace manufacturing (composites, elastomerics, etc.)
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 55,000
Annual Production 400,000 Units
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,013 599,319 kWh $0.07
Electricity Demand $79,870 3,415 kW-months/year $23.39
TOTAL ENERGY COSTS $123,883
RECOMMENDED SAVINGS* $47,192 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,538
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$23,815
Cost:
$6,140
$25,637 349,277 $10,947 468 $(-12,769) (-1,702) - - $25,637
349,277
kWh
$10,947
468
kW-months/year
$(-12,769)
(-1,702)
MMBtu
-
-
$
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$14,497
Cost:
$72,900
$(-921) (-12,543) $15,418 933 - - - - $(-921)
(-12,543)
kWh
$15,418
933
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,738
Cost:
$11,315
$2,868 31,618 $2,845 122 - - $25 - $2,868
31,618
kWh
$2,845
122
kW-months/year
-
-
MMBtu
$25
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,534
Cost:
$2,950
$1,284 17,487 $1,250 53 - - - - $1,284
17,487
kWh
$1,250
53
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$451
Cost:
$700
$451 6,149 - - - - - - $451
6,149
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$157
Cost:
$400
$157 2,151 - - - - - - $157
2,151
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$47,192
Cost:
$94,405
$29,476 394,139 $30,460 1,576 $(-12,769) (-1,702) $25 - $29,476
394,139
kWh
$30,460
1,576
kW-months/year
$(-12,769)
(-1,702)
MMBtu
$25
-
$
TOTAL IMPLEMENTED Savings:
$32,538
Cost:
$21,105
$30,240 404,531 $15,042 643 $(-12,769) (-1,702) $25 - $30,240
404,531
kWh
$15,042
643
kW-months/year
$(-12,769)
(-1,702)
MMBtu
$25
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost