Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
221
matching recommendationsNAICS | 33641 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0430 # 02 Y:2010 | 02 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,044 | $0 | Implemented |
UF0430 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,531 | $0 | Not Implemented |
UF0430 # 04 Y:2010 | 04 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,547 | $0 | Implemented |
UF0430 # 05 Y:2010 | 05 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,211 | $0 | Not Implemented |
UF0430 # 06 Y:2010 | 06 | 2010 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $86,549 | $4,000 | Not Implemented |
UF0430 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,016 | $404 | Implemented |
UF0430 # 08 Y:2010 | 08 | 2010 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $6,842 | $0 | Implemented |
MI0154 # 01 Y:2007 | 01 | 2007 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $99,787 | $131,000 | Not Implemented |
MI0154 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,215 | $73,710 | Implemented |
MI0154 # 03 Y:2007 | 03 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $30,511 | $120 | Implemented |
MI0154 # 04 Y:2007 | 04 | 2007 | DISCONNECT BALLASTS | $27,192 | $1,450 | Not Implemented |
MI0154 # 05 Y:2007 | 05 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,388 | $1,250 | Not Implemented |
MI0154 # 06 Y:2007 | 06 | 2007 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,146 | $300 | Implemented |
MI0154 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,092 | $1,074 | Implemented |
MI0154 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,043 | $30 | Implemented |
UF0402 # 01 Y:2007 | 01 | 2007 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $29,529 | $1,827 | Not Implemented |
UF0402 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM THICKNESS INSULATION | $640 | $2,320 | Not Implemented |
UF0402 # 03 Y:2007 | 03 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $335 | $177 | Implemented |
UF0402 # 04 Y:2007 | 04 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,214 | $0 | Implemented |
UF0402 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,361 | $80,399 | Not Implemented |
UF0402 # 06 Y:2007 | 06 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $13,315 | $57,868 | Not Implemented |
UF0402 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $3,641 | $194 | Implemented |
UF0402 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,006 | $1,413 | Not Implemented |
UF0402 # 09 Y:2007 | 09 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $38,931 | $2,136 | Not Implemented |
UF0402 # 10 Y:2007 | 10 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,194 | $390 | Implemented |