Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
16
matching recommendationsNAICS | 336411 | Aircraft Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0474 # 01 Y:2019 | 01 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $20,118 | $5,404 | Implemented |
AS0474 # 02 Y:2019 | 02 | 2019 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $9,875 | $2,238 | Implemented |
AS0474 # 03 Y:2019 | 03 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,733 | $750 | Implemented |
AS0474 # 04 Y:2019 | 04 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,818 | $895 | Implemented |
AS0474 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,935 | $516 | Implemented |
AS0474 # 06 Y:2019 | 06 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,267 | $110 | Not Implemented |
AS0474 # 07 Y:2019 | 07 | 2019 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $838 | $687 | Not Implemented |
AS0474 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $77 | $0 | Implemented |
AS0421 # 01 Y:2006 | 01 | 2006 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $79,716 | $39,658 | n/a |
AS0421 # 02 Y:2006 | 02 | 2006 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $3,068 | $1,500 | n/a |
AS0421 # 03 Y:2006 | 03 | 2006 | INSTALL EFFICIENT RECTIFIERS | $576 | $15,000 | n/a |
AS0416 # 01 Y:2006 | 01 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,751 | $36,000 | Not Implemented |
AS0416 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,872 | $34,827 | Implemented |
AS0416 # 03 Y:2006 | 03 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,096 | $0 | Implemented |
AS0416 # 04 Y:2006 | 04 | 2006 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,237 | $0 | Not Implemented |
AS0416 # 05 Y:2006 | 05 | 2006 | USE SOLAR HEAT TO HEAT WATER | $345 | $2,050 | Not Implemented |