Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
Reset
NAICS 336411 Aircraft Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0261 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $22,296 $572,100 n/a
UU0261 # 02 Y:2024 02 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,592 $37,200 n/a
UU0261 # 03 Y:2024 03 2024 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $12,100 $21,600 n/a
UU0261 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,063 $9,140 n/a
UU0261 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,386 $8,280 n/a
UU0261 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $400 $5,940 n/a
UU0060 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,202 $13,200 Implemented
UU0060 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,695 $4,800 Not Implemented
UU0060 # 03 Y:2004 03 2004 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,059 $4,000 Implemented
UU0060 # 04 Y:2004 04 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,047 $2,600 Not Implemented
UU0060 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $309 $723 Not Implemented
UU0060 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,853 $0 Not Implemented
UU0060 # 07 Y:2004 07 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,897 $200 Implemented