Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 336412 | Aircraft Engine and Engine Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1092 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,882 | $187,200 | Not Implemented |
OK1092 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,058 | $2,490 | Not Implemented |
OK1092 # 02 Y:2023 | 02 | 2023 | USE PHOTOCELL CONTROLS | $131 | $370 | Not Implemented |
OK1092 # 01 Y:2023 | 01 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $21,822 | $92,250 | Not Implemented |
OK0832 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $655 | $4,180 | Not Implemented |
OK0832 # 11 Y:2012 | 11 | 2012 | OPTIMIZE PLANT POWER FACTOR | $1,632 | $8,864 | Not Implemented |
OK0832 # 10 Y:2012 | 10 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,669 | $696 | Not Implemented |
OK0832 # 09 Y:2012 | 09 | 2012 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,579 | $1,170 | Implemented |
OK0832 # 08 Y:2012 | 08 | 2012 | INSTALL SET-BACK TIMERS | $2,158 | $185 | Not Implemented |
OK0832 # 07 Y:2012 | 07 | 2012 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $6,074 | $29,738 | Not Implemented |
OK0832 # 06 Y:2012 | 06 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,382 | $34,962 | Not Implemented |
OK0832 # 05 Y:2012 | 05 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $18,428 | $7,200 | Not Implemented |
OK0832 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $995 | $6,375 | Not Implemented |
OK0832 # 02 Y:2012 | 02 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $955 | $1,288 | Not Implemented |
OK0832 # 01 Y:2012 | 01 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,902 | $7,700 | Not Implemented |
OK0697 # 01 Y:2004 | 01 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $11,600 | $0 | Implemented |
OK0697 # 09 Y:2004 | 09 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,054 | $18,900 | Not Implemented |
OK0697 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,392 | $3,349 | Implemented |
OK0697 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $369 | $360 | Implemented |
OK0697 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $837 | $730 | Implemented |
OK0697 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $356 | $269 | Not Implemented |
OK0697 # 04 Y:2004 | 04 | 2004 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $15,364 | $10,542 | Not Implemented |
OK0697 # 03 Y:2004 | 03 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,032 | $1,400 | Not Implemented |
OK0697 # 02 Y:2004 | 02 | 2004 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $2,218 | $100 | Not Implemented |