Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsNAICS | 336412 | Aircraft Engine and Engine Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1054 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $624 | $2,620 | Implemented |
OK1054 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $7,661 | $7,500 | Not Implemented |
OK1054 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,347 | $2,505 | Implemented |
OK1053 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $11,834 | $16,500 | Not Implemented |
OK1053 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,462 | $16,440 | Implemented |
OK1053 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,980 | $0 | Implemented |
OK1053 # 04 Y:2021 | 04 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,785 | $1,966 | Not Implemented |
OK1053 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,155 | $26,670 | Implemented |
OK1053 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,195 | $3,190 | Implemented |
TR0005 # 03 Y:2017 | 03 | 2017 | CHANGE METHOD OF DEIONIZED WATER PRODUCTION | $258,000 | $292,000 | Implemented |
TR0005 # 09 Y:2017 | 09 | 2017 | ISOLATE HOT OR COLD EQUIPMENT | $292 | $1,422 | Not Implemented |
TR0005 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,836 | $8,821 | Implemented |
TR0005 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $15,338 | $56,000 | Implemented |
TR0005 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $287 | $494 | Implemented |
TR0005 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $223 | $399 | Implemented |
TR0005 # 10 Y:2017 | 10 | 2017 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $8,320 | $966 | Implemented |
TR0005 # 11 Y:2017 | 11 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,882 | $25,954 | Implemented |
TR0005 # 04 Y:2017 | 04 | 2017 | METER WASTE WATER | $11,708 | $2,650 | Implemented |
TR0005 # 01 Y:2017 | 01 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $4,452 | $6,500 | Implemented |
TR0005 # 02 Y:2017 | 02 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,056 | $417 | Not Implemented |
TA0131 # 01 Y:2006 | 01 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $18,180 | $16 | Implemented |
TA0131 # 02 Y:2006 | 02 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,225 | $60 | Not Implemented |
TA0131 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,450 | $120 | Implemented |
TA0131 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,400 | $0 | Implemented |
TA0131 # 03 Y:2006 | 03 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,180 | $630 | Not Implemented |