Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 336412 | Aircraft Engine and Engine Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0412 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $37,178 | $15,000 | Implemented |
AS0412 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,601 | $2,000 | Implemented |
AS0412 # 04 Y:2005 | 04 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,470 | $14,400 | Implemented |
AS0412 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,173 | $10,610 | Implemented |
AS0412 # 06 Y:2005 | 06 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $762 | $25 | Implemented |
AS0412 # 07 Y:2005 | 07 | 2005 | USE SOLAR HEAT TO HEAT WATER | $345 | $2,800 | Implemented |
AS0412 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $37,489 | $5,000 | Implemented |
GT0806 # 08 Y:2005 | 08 | 2005 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $10,300 | $13,870 | Not Implemented |
GT0806 # 07 Y:2005 | 07 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,000 | $59,670 | Not Implemented |
GT0806 # 06 Y:2005 | 06 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $28,900 | $135,800 | Not Implemented |
GT0806 # 05 Y:2005 | 05 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,600 | $2,613 | Not Implemented |
GT0806 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,900 | $52,200 | Not Implemented |
GT0806 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,230 | $2,150 | Implemented |
GT0806 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,300 | $23,431 | Not Implemented |
GT0806 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $22,100 | $2,782 | Not Implemented |
UD0715 # 09 Y:2005 | 09 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $531 | $0 | Implemented |
UD0715 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $781 | $130 | Not Implemented |
UD0715 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $781 | $340 | Implemented |
UD0715 # 06 Y:2005 | 06 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,689 | $0 | Not Implemented |
UD0715 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,021 | $0 | Implemented |
UD0715 # 04 Y:2005 | 04 | 2005 | REPAIR AND ELIMINATE STEAM LEAKS | $2,597 | $500 | Implemented |
UD0715 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,402 | $100 | Implemented |
UD0715 # 02 Y:2005 | 02 | 2005 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $21,170 | $62,500 | Not Implemented |
UD0715 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,797 | $53,464 | Implemented |
UM0278 # 01 Y:2005 | 01 | 2005 | COVER OPEN TANKS | $33,962 | $480 | Implemented |