Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsNAICS | 336412 | Aircraft Engine and Engine Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0802 # 10 Y:2010 | 10 | 2010 | COMBINE UTILITY METERS | $936 | $175 | Implemented |
OK0802 # 09 Y:2010 | 09 | 2010 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $11,625 | $0 | Implemented |
OK0802 # 08 Y:2010 | 08 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $23,800 | $15,600 | Implemented |
OK0802 # 07 Y:2010 | 07 | 2010 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $30,411 | $45,000 | Implemented |
OK0802 # 06 Y:2010 | 06 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,918 | $2,775 | Implemented |
OK0802 # 05 Y:2010 | 05 | 2010 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $11,414 | $51,875 | Implemented |
OK0802 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $1,998 | $13,149 | Implemented |
OK0802 # 01 Y:2010 | 01 | 2010 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,017 | $6,215 | Not Implemented |
OK0802 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,400 | $1,550 | Implemented |
OK0802 # 03 Y:2010 | 03 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,477 | $2,599 | Not Implemented |
BD0379 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $12,675 | $5,775 | n/a |
BD0379 # 07 Y:2010 | 07 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,893 | $300 | Not Implemented |
BD0379 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $198 | $350 | n/a |
BD0379 # 05 Y:2010 | 05 | 2010 | USE SYNTHETIC LUBRICANT | $1,393 | $300 | Not Implemented |
BD0379 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,550 | $8,550 | Not Implemented |
BD0379 # 03 Y:2010 | 03 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $10,691 | $14,000 | Not Implemented |
BD0379 # 01 Y:2010 | 01 | 2010 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $43,359 | $156,000 | Not Implemented |
BD0379 # 08 Y:2010 | 08 | 2010 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $2,879 | $1,680 | n/a |
SU0294 # 10 Y:2010 | 10 | 2010 | UPGRADE OBSOLETE EQUIPMENT | $276 | $1,831 | Implemented |
SU0294 # 09 Y:2010 | 09 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $108 | $516 | Not Implemented |
SU0294 # 08 Y:2010 | 08 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,680 | $17,732 | Not Implemented |
SU0294 # 07 Y:2010 | 07 | 2010 | OPTIMIZE PLANT POWER FACTOR | $1,808 | $9,734 | Not Implemented |
SU0294 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $142 | $817 | Implemented |
SU0294 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $267 | $492 | Implemented |
SU0294 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,763 | $1,440 | Implemented |