Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
NAICS 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2401 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $6,204 $23,347 n/a
UW2401 # 01 Y:2024 01 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $141,044 $149,500 n/a
UW2401 # 03 Y:2024 03 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,711 $4,441 n/a
UW2401 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,688 $3,000 n/a
UW2401 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,098 $26,080 n/a
UW2401 # 06 Y:2024 06 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $26,650 $58,013 n/a
UW2319 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,789 $3,000 n/a
UW2319 # 06 Y:2023 06 2023 USER BATTERY STORAGE FOR POWER QUALITY ISSUES $750,000 $871,000 n/a
UW2319 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,837 $2,080 n/a
UW2319 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,001 $2,820 n/a
UW2319 # 01 Y:2023 01 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $56,470 $23,651 n/a
UW2319 # 04 Y:2023 04 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,443 $68,000 n/a
UW2311 # 01 Y:2023 01 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,427 $15,722 n/a
UW2311 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,668 $83,148 n/a
UW2311 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $2,080 n/a
UW2311 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $112,574 $693,588 n/a
UW2311 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $11,250 $49,905 n/a
UW2310 # 01 Y:2023 01 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $29,254 $128,809 n/a
UW2310 # 02 Y:2023 02 2023 UPGRADE OBSOLETE EQUIPMENT $153,154 $859,050 n/a
UW2310 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,425 $1,000 n/a
UW2310 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,210 $16,378 n/a
BS0057 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $11,687 $16,725 Not Implemented
BS0057 # 06 Y:2015 06 2015 INSTALL TIMERS AND/OR THERMOSTATS $332 $116 Not Implemented
BS0057 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,229 $6,050 Not Implemented
BS0057 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,516 $910 Not Implemented