IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
NAICS 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0391 # 03 Y:2021 03 2021 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,712 $7,497 Not Implemented
MI0391 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,221 $18,127 Not Implemented
MI0391 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,882 $1,980 Implemented
BS0154 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,750 $3,231 Not Implemented
BS0154 # 07 Y:2021 07 2021 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $893 $710 Not Implemented
BS0154 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $679 $280 Not Implemented
BS0154 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,232 $320 Not Implemented
BS0154 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $766 $25 Not Implemented
BS0154 # 05 Y:2021 05 2021 ADOPT IN-HOUSE MATERIAL GENERATION $182,277 $204,462 Not Implemented
BS0154 # 06 Y:2021 06 2021 RECOVER WASTE HEAT FROM EQUIPMENT $8,288 $6,000 Not Implemented
NC0669 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,041 $11,374 n/a
NC0669 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $16,266 $40,000 n/a
NC0669 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $854 $300 n/a
NC0669 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,310 $30,000 n/a
SD0613 # 02 Y:2021 02 2021 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $8,370 $5,000 Implemented
SD0613 # 01 Y:2021 01 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,677 $16,500 Implemented
SD0613 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $218 $2,500 Implemented
SD0613 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,201 $1,065 Implemented
SD0613 # 04 Y:2021 04 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $590 $1,500 Not Implemented
MI0389 # 08 Y:2021 08 2021 USE COMPRESSOR AIR FILTERS $1,420 $1,100 Implemented
MI0389 # 07 Y:2021 07 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,000 $480 Not Implemented
MI0389 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $15,421 $6,812 Not Implemented
MI0389 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,025 $120 Implemented
MI0389 # 04 Y:2021 04 2021 INSTALL EFFICIENT RECTIFIERS $21,196 $55,920 Implemented
MI0389 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,739 $33,655 Implemented