IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 3365 Railroad Rolling Stock Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0560 # 03 Y:2018 03 2018 UPGRADE CONTROLS ON COMPRESSORS $8,930 $8,000 Not Implemented
WV0560 # 08 Y:2018 08 2018 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $124 $67 Not Implemented
WV0560 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,778 $37,964 Not Implemented
WV0560 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,101 $10,000 Implemented
WV0560 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,007 $1,200 Implemented
WV0560 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,821 $180 Implemented
WV0560 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,154 $80 Implemented
WV0560 # 06 Y:2018 06 2018 MINIMIZE WATER USAGE $1,679 $1,400 Implemented
WV0518 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $5,682 $3,428 Implemented
WV0518 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $2,986 $510 Implemented
WV0518 # 07 Y:2016 07 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,361 $21,950 Implemented
WV0518 # 06 Y:2016 06 2016 REPAIR OR REPLACE STEAM TRAPS $6,437 $7,861 Implemented
WV0518 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,416 $500 Implemented
WV0518 # 10 Y:2016 10 2016 DEVELOP A REPAIR/REPLACE POLICY $2,441 $1,398 Not Implemented
WV0518 # 04 Y:2016 04 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,556 $43,115 Not Implemented
WV0518 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,512 $706 Implemented
WV0518 # 02 Y:2016 02 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,399 $914 Implemented
WV0518 # 01 Y:2016 01 2016 UPGRADE CONTROLS ON COMPRESSORS $17,135 $20,642 Implemented
WV0518 # 11 Y:2016 11 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,011 $128 Implemented
WV0518 # 12 Y:2016 12 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $556 $2,428 Implemented
WV0451 # 13 Y:2012 13 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,600 $2,500 Implemented
WV0451 # 12 Y:2012 12 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,612 $1,260 Not Implemented
WV0451 # 11 Y:2012 11 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,982 $9,000 Not Implemented
WV0451 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $3,732 $1,737 Implemented
WV0451 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,858 $380 Implemented