Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 336510 | Railroad Rolling Stock Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0560 # 08 Y:2018 | 08 | 2018 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $124 | $67 | Not Implemented |
WV0560 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,007 | $1,200 | Implemented |
WV0560 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $1,679 | $1,400 | Implemented |
WV0560 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,101 | $10,000 | Implemented |
WV0560 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,154 | $80 | Implemented |
WV0560 # 03 Y:2018 | 03 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $8,930 | $8,000 | Not Implemented |
WV0560 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,821 | $180 | Implemented |
WV0560 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,778 | $37,964 | Not Implemented |
WV0518 # 04 Y:2016 | 04 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,556 | $43,115 | Not Implemented |
WV0518 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,512 | $706 | Implemented |
WV0518 # 05 Y:2016 | 05 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,416 | $500 | Implemented |
WV0518 # 06 Y:2016 | 06 | 2016 | REPAIR OR REPLACE STEAM TRAPS | $6,437 | $7,861 | Implemented |
WV0518 # 07 Y:2016 | 07 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,361 | $21,950 | Implemented |
WV0518 # 08 Y:2016 | 08 | 2016 | INSULATE BARE EQUIPMENT | $5,682 | $3,428 | Implemented |
WV0518 # 09 Y:2016 | 09 | 2016 | INSTALL OCCUPANCY SENSORS | $2,986 | $510 | Implemented |
WV0518 # 10 Y:2016 | 10 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $2,441 | $1,398 | Not Implemented |
WV0518 # 11 Y:2016 | 11 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,011 | $128 | Implemented |
WV0518 # 12 Y:2016 | 12 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $556 | $2,428 | Implemented |
WV0518 # 02 Y:2016 | 02 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,399 | $914 | Implemented |
WV0518 # 01 Y:2016 | 01 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $17,135 | $20,642 | Implemented |
WV0451 # 02 Y:2012 | 02 | 2012 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $6,271 | $1,000 | Not Implemented |
WV0451 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,277 | $41,953 | Not Implemented |
WV0451 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,062 | $5,773 | Implemented |
WV0451 # 04 Y:2012 | 04 | 2012 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,597 | $27,000 | Not Implemented |
WV0451 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,858 | $380 | Implemented |