Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
160
matching recommendationsNAICS | 336611 | Ship Building and Repairing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS1802 # 03 Y:2018 | 03 | 2018 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $4,166 | $2,667 | Not Implemented |
LS1802 # 04 Y:2018 | 04 | 2018 | USE PHOTOCELL CONTROLS | $427 | $400 | Implemented |
LS1802 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $379 | $0 | Implemented |
LS1802 # 02 Y:2018 | 02 | 2018 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $1,300 | $200 | Implemented |
LS1802 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $159 | $550 | Implemented |
LE0437 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,208 | $20,000 | Not Implemented |
LE0437 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $12,220 | $7,000 | Not Implemented |
LE0437 # 08 Y:2017 | 08 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $21,363 | $60,000 | Not Implemented |
LE0437 # 07 Y:2017 | 07 | 2017 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $86,210 | $200,000 | Not Implemented |
LE0437 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,862 | $12,000 | Not Implemented |
LE0437 # 05 Y:2017 | 05 | 2017 | INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES | $35,693 | $50,000 | Not Implemented |
LE0437 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,482 | $14,000 | Not Implemented |
LE0437 # 03 Y:2017 | 03 | 2017 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $37,770 | $36,000 | Not Implemented |
LL0354 # 01 Y:2011 | 01 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $118,318 | $14,310 | Implemented |
LL0354 # 05 Y:2011 | 05 | 2011 | INSTALL OCCUPANCY SENSORS | $1,682 | $6,180 | Not Implemented |
LL0354 # 09 Y:2011 | 09 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $155 | $184 | Not Implemented |
LL0354 # 04 Y:2011 | 04 | 2011 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $8,821 | $1,830 | Not Implemented |
LL0354 # 10 Y:2011 | 10 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $120 | $70 | Not Implemented |
LL0354 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $43,188 | $6,720 | Implemented |
LL0354 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26,279 | $60 | Implemented |
LL0354 # 08 Y:2011 | 08 | 2011 | USE PHOTOCELL CONTROLS | $590 | $30 | Not Implemented |
LL0354 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $753 | $314 | Not Implemented |
LL0354 # 06 Y:2011 | 06 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,139 | $490 | Not Implemented |
LL0353 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $72,556 | $22,440 | Implemented |
LL0353 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,693 | $30 | Not Implemented |