IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170

matching recommendations
Reset
NAICS 33699 Other Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0428 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $11,631 $131,059 n/a
MS0428 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $788 $1,677 n/a
MS0428 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $647 $0 n/a
MS0429 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $5,847 $35,728 n/a
MS0429 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,731 $8,233 n/a
MS0429 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,143 $0 n/a
UW2214 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,351 $2,080 Not Implemented
UW2214 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,014 $0 Not Implemented
UW2214 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $843 $970 Not Implemented
SU0519 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,052 $0 Not Implemented
SU0519 # 08 Y:2022 08 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $244 $479 Not Implemented
SU0519 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,384 $285 Not Implemented
SU0519 # 06 Y:2022 06 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,357 $675 Not Implemented
SU0519 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $384 $25 Not Implemented
SU0519 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,214 $498 Not Implemented
SU0519 # 09 Y:2022 09 2022 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $312 $1,100 Not Implemented
SU0519 # 02 Y:2022 02 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $967 $0 Not Implemented
SU0519 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,650 $294 Not Implemented
SU0519 # 10 Y:2022 10 2022 INSTALL OCCUPANCY SENSORS $149 $746 Not Implemented
TT0263 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,663 $88,815 Implemented
TT0263 # 04 Y:2021 04 2021 ADOPT IN-HOUSE MATERIAL GENERATION $9,686 $17,700 Not Implemented
TT0263 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,140 $5,000 Not Implemented
TT0263 # 01 Y:2021 01 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $45,807 $72,000 Not Implemented
TT0263 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,566 $6,725 Not Implemented
UD1021 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,283 $0 Implemented